Lifting Operation Conduct a test lift (10–15 cm off the trailer) to confirm balance. If stable, raise the vaporizer slowly to clear the trailer bed. Banksman directs the movement using standard hand signals. Maintain smooth and controlled motion to avoid swaying. Rotate or slew boom as needed to move vaporizer towards laydown area.
04.12.2025 07:04